medianproject logo

COST Action IC1103

cost action logo

working group 5

Fault tolerance for transportation systems

WG Chair: Oliver Bringmann (FZI Karlsruhe – Germany)
WG Vice Chair: Viacheslav Izosimov (Semcon AB – Sweden)


The objectives of Work Group 5 are:

  1. Real-Time Systems
    One of the key requirements of transportation systems is not only the logical correctness of the output responses, but also their temporal correctness. A reliable system usable in automotive, avionic, or railways scenario should assure the correctness of the result in real-time. This requirement drives the design of fault tolerant systems for these applications toward the use of hardware/information redundancy, discarding all the time redundancy solution that can have an unacceptable delay in providing the correct answer.
  2. Validation of fail-safe systems
    Another important requirement for transportation systems is their validation. Validation is not only necessary for the qualitative and quantitative assessment of safety but also to elevate the confidence level of the system. All safety-critical applications must undergo validation by respective authorities before their actual usage. For example the systems used in railway domain follows the CENELEC (European Committee for Electro-technical Standardisation) Norms. Also the validation process requires a re-thinking when multicore architecture and/or nanoscale technologies are used.
 
 

COST is supported by the EU Framework Programme Horizon 2020